尤物yw午夜国产精品视频-国产乱人伦精品免费-国产精品成熟老妇女-香蕉久久a毛片-男人j桶进女人p无遮挡免费观看-成人αv-久草福利在线观看-天天做av天天爱天天爽-777色婷婷视频二三区-欧美精品一级片-在线观看黄色动漫-欧美激情视频一区二区三区在线播放-欧美综合影院-欧美精品色婷婷五月综合-96超碰在线

Home > News > Detail

Detail

MengHua railway project starts construction

2015-08-19   【 Big  Middle  Small 】   【 Printing 】   【 Close

On July 28, 2015, the coal transportation railway corridor project from west of Inner Mongolia to Central China (hereinafter referred to as MengHua Railway Project) started construction comprehensively.CEC undertakes the engineering survey and design work for the Jingmen-Yueyang section of MengHua Railway Project. It is another commencement of 30-ton-axle-load coal transportation corridor, after the 1st heavy load railway lineof Shanxi middle south railway project completed and started to operation which was designed by CEC.

MengHua RailwayProject passes through Inner Mongolia, Shannxi, Shanxi, Henan, Hubei, Hunan and Jiangxi seven provinces from north to south with the length of 1817.2 KM, adopts national class A railway standard with the design speed of 120KM/H and heavy duty specification (referred as 1.2 times ZH(2005) live load). It is the national strategic corridor of the new railway ofthe“North South Coal transport”, with the perspective long term annual transportation capacity of 200 million tons.